G
NEPTUNE PE-DE_en_Ver.1.0_October 2010
Adjustment / Test
71
Boiler
4. Flame sensor.
5. Fuel nozzle.
6. Air distributer.
Fig.F.49.
Boiler top
2.
1.
3.
4.
5.
6.
1. Ignition Transformer.
2. Ignition cords.
3. Ignition electrodes
5mm
4mm
Fuel nozzle.
5mm
Fuel nozzle.
Heating system - Overview.
Jetwash Direct ltd
Summary of Contents for NEPTUNE 5-46 PE
Page 1: ...Service Manual NEPTUNE PE DE NEPTUNE PE DE_en_Ver 1 0_October 2010 Jetwash Direct ltd...
Page 42: ...F NEPTUNE PE DE_en_Ver 1 0_October 2010 Service Repair 42 NA5 Pump Jetwash Direct ltd...
Page 48: ...F NEPTUNE PE DE_en_Ver 1 0_October 2010 Service Repair 48 C3 Pump Jetwash Direct ltd...
Page 93: ...93 NEPTUNE PE DE_en_Ver 1 0_October 2010 Notes Jetwash Direct ltd...
Page 94: ...JETWASH DIRECT LTD www jetwashdirect co uk sales jetwashdirect co uk Jetwash Direct ltd...