D
27
NEPTUNE PE-DE_en_Ver.1.0_October 2010
Function
Functional desription of Circuit Board, A1—Continued
Control Circuit Board:
Pos. 1: The heating and ON/OFF switch (S1)
Pos. 2: Heating Relay (K2)
Pos. 3: LED’s
Pos. 4: Fuse—Self-resetting ”Pico fuse”
Pos. 5: Fuse
Pos. 6: Fuse
Control Circuit Board A1
On the above picture is the correct setting of the
circuit board.
Arrow 1
Setting is WITHOUT JUMPER =
By-pass time
active
Arrow 2:
Setting is JUMPER MOUNTED ON PIN 2 AND 3
=
Flame Sensor active.
Circuit board (A2) has LED’s for
the motor, e.g. water temperature,
motor oil level etc.
Circuit Board A2 (A1)
Jetwash Direct ltd
Summary of Contents for NEPTUNE 5-46 PE
Page 1: ...Service Manual NEPTUNE PE DE NEPTUNE PE DE_en_Ver 1 0_October 2010 Jetwash Direct ltd...
Page 42: ...F NEPTUNE PE DE_en_Ver 1 0_October 2010 Service Repair 42 NA5 Pump Jetwash Direct ltd...
Page 48: ...F NEPTUNE PE DE_en_Ver 1 0_October 2010 Service Repair 48 C3 Pump Jetwash Direct ltd...
Page 93: ...93 NEPTUNE PE DE_en_Ver 1 0_October 2010 Notes Jetwash Direct ltd...
Page 94: ...JETWASH DIRECT LTD www jetwashdirect co uk sales jetwashdirect co uk Jetwash Direct ltd...