SD210 Series
Operating & Safety Instructions
English/USA – 07/11
Issue 06
14
3
Preparation and Inspection
3.1
UNPACKING
Since the manufacturer has no direct control over the shipping or carriage of any Niftylift it is the
responsibility of the dealer and/or owner and/or leaser to ensure the Niftylift has not been damaged in
transit and a Pre-operational Report has been carried out by a qualified engineer before the aerial
platform is put into service.
1)
Remove all ropes, straps and or chains used to secure the aerial platform during transit.
2)
Ensure any ramp, loading dock or forklift used is capable of supporting or lifting the aerial
platform.
3)
If the aerial platform is to be driven off, please ensure that the operator has read and fully
understood this entire manual. Refer to the appropriate section for precise operating
instructions.
***Carry out the Pre-operational Report before placing machine in service.
3.2
PREPARATION FOR USE
Whilst every effort has been made at the Niftylift factory to ensure your machine
arrives in a safe and operable condition it is necessary to carry out a systematic
inspection prior to putting the aerial platform into service.
THIS IS NOT A REQUEST IT IS MANDATORY.
To assist the user in this task you will find enclosed an Inspection Check List (see section 6.3), which
must be filled out upon delivery/receipt of the machine.
Before the user carries out the Inspection Check List he must have read and fully understood all the
contents of the Operating, Safety and Maintenance Manual.
WARNING - DO NOT OPERATE A POTENTIALLY DEFECTIVE OR
MALFUNCTIONING MACHINE. CORRECT AND REPAIR ANY DEFECTS BEFORE
OPERATING YOUR NIFTYLIFT.
Summary of Contents for SD210 Series
Page 2: ......