14
NIBE BA-SVM 10-200
• It is recommended that you install the
BA-SVM 10-200 unit in a room which is equipped
with a floor drain and protected against freezing.
• The ground should be of a sufficient load capaci-
ty, preferably concrete.
• The BA-SVM 10-200 unit must be positioned with
its back against a building wall. The device should
not be placed against the walls of rooms in use
where noise could be a problem.
• The appliance can be levelled using the adjusta-
ble feet.
• Route pipes so they are not adjacent to the wall
of a bedroom or living room where noise could
be a problem.
• Ensure that there is approx. 800 mm free space
in front of and 500 mm above the appliance to
facilitate any future servicing.
1. Dock the BA-SVM 10-200 unit to the central heat-
ing system as well as the cold and hot water
pipelines.
2. Install refrigerant pipes.
3. Connect the current sensors, outdoor tempera-
ture sensor, the lines between BA-SVM 10-200
and AMS 10, as well as the communication and
power supply.
4. Connect the electric power supply (230V or 400V)
to the BA-SVM 10-200 unit.
5. Proceed according to the commissioning instruc-
tions in the section Commissioning and adjust-
ing.
Recommended order of assembly
XL10
XL1
XL2
-EB101
-BT1
BA-SVM 10-200
-GP11
P
XL18
XL19
HS1 -BP4
-BT15
-BT3
-GP12
-BT25
-QN12
-BT63
-BT71
-QN10
-BT7
-BT6
P
EQ-BT25/BT64
Diagram showing connection of an additional heat source
NOTE
The maximum recommended power of the additional
heat source cannot exceed 15kW.
Section 4 |
Pipe connections
Summary of Contents for BA-SVM 10-200 Series
Page 2: ......
Page 86: ...86 NIBE BA SVM 10 200 ...
Page 87: ......
Page 88: ...NIBE Group Hannabadsvägen 5 285 32 Markaryd Sweden www nibe eu ...