Item register
A
Accessories, 39
Adjustment, charge flow, 26
Alarm management, 36
Assembly, 5
B
Brine side, 14
Connecting the brine side, 14
Dimensioning of pressure expansion vessel, 15
C
Cable lock, 21
Commissioning and adjusting, 26
Adjustment, charge flow, 26
Filling and venting the brine system, 26
Preparations, 26
Readjusting, brine side, 26
Start-up and inspection, Hybrid operation, 26
Start-up and inspection, Outdoor air operation, 26
Connecting the brine side, 14
Connections, 21
Contact information, 4
Control, 27–28
Control - Introduction, 27
Control - Menus, 28
Control - Introduction, 27
The control unit, 27
Control - Menus, 28
D
Delivery and handling, 5
Assembly, 5
Installation area, 8
Removing the covers, 9
Supplied components, 9
Transport and storage, 5
Dimensioning of pressure expansion vessel, 15
Dimensions and pipe connections, 14
Dimensions and setting-out coordinates, 40
Disturbances in comfort, 36
Alarm management, 36
Troubleshooting, 38
Docking alternatives, 16
E
Electrical circuit diagram, 45
Electrical connections, 20
Cable lock, 21
Circulation pump for defrosting, 24
Common alarm, 25
Compressor blocking in NIBE F1345 when defrosting, 25
Connecting several AMB 30, 23
Connections, 21
General, 20
Optional connections, 23
Power connection, 21
Reversing valve for defrosting, 24
Emptying the brine system, 34
F
Filling and venting the brine system, 26
H
Helping the circulation pump to start, 34
Hybrid operation, 13
I
Important information, 2
Safety information, 2
Inspection of the installation, 3
Installation area, 8
M
Marking, 2
O
Optional connections, 23
Outdoor air operation, 12
P
Pipe connections, 12
Brine side, 14
Dimensions and pipe connections, 14
Docking alternatives, 16
General, 12
Symbol key, 12
System diagram, 12
Power connection, 21
Preparations, 26
R
Readjusting, brine side, 26
Removing the covers, 9
S
Safety information, 2
Contact information, 4
Inspection of the installation, 3
Marking, 2
Serial number, 2
Symbols, 2
Sensor placement, 35
Serial number, 2
Service, 34
Service actions, 34
Service actions, 34
Emptying the brine system, 34
Helping the circulation pump to start, 34
Sensor placement, 35
Temperature sensor data, 34
Sound pressure levels, 41
Start-up and inspection, Hybrid operation, 26
Start-up and inspection, Outdoor air operation, 26
Supplied components, 9
Symbol key, 12
Symbols, 2
System diagram, 12
Hybrid operation, 13
Outdoor air operation, 12
T
Technical data, 40
Dimensions and setting-out coordinates, 40
Electrical circuit diagram, 45
Sound pressure levels, 41
Technical Data, 42
Technical Data, 42
Temperature sensor data, 34
The air collector module's, 10
Component locations, 10
List of components, 10
The control unit, 27
Transport and storage, 5
Troubleshooting, 38
AMB 30
Chapter 13 |
Item register
48
13 Item register
Summary of Contents for AMB 30
Page 1: ...Installer manual LEK AMB 30 Accessories F1345 IHB GB 1341 1 231417 ...
Page 2: ......
Page 47: ...Electrical circuit diagram 45 Chapter 12 Technical data AMB 30 ...
Page 48: ...AMB 30 Chapter 12 Technical data 46 ...
Page 49: ...47 Chapter 12 Technical data AMB 30 ...
Page 51: ......
Page 52: ...NIBE AB Sweden Hannabadsvägen 5 Box 14 SE 285 21 Markaryd info nibe se www nibe eu 231417 ...