General
All electrical equipment, except the ambient temperat-
ure sensor, circulation pumps, reversing valves and ex-
ternal communication is already connected at the
factory.
The cables for heavy current and the signal cables
should be routed from the side at the folded part of
the side panel on the left-hand side of AMB 30. Power
supply is routed through the cable grommet UB1,
power supply for the circulation pumps and reversing
valves through UB2 toUB4, communication cables
through UB5 to UB7 and signal cables through the re-
maining cable grommets.
႑
Connection of AMB 30 may not occur without the
approval of the electricity supplier and must be su-
pervised by an authorised electrician.
႑
Disconnect the heat pump and AMB 30 before insu-
lation testing the house wiring.
႑
If the building is equipped with an earth-fault
breaker, each AMB 30 should be equipped with a
separate one.
႑
If a miniature circuit breaker is used it should have
motor characteristic “C”. For MCB size see "Technical
Specifications".
႑
For the air collector module electrical wiring diagram,
see page 45.
႑
Communication and sensor cables to external con-
nections must not be laid close to high current cables.
႑
The minimum area of communication and sensor
cables to external connections must be 0.5 mm² up
to 50 m, for example EKKX or LiYY or equivalent.
႑
When cable routing in AMB 30, cable grommets must
be used according to the table below.
Type of cable
Cable gland
Electrical supply
UB1
Power supply for circulation pumps
and reversing valves
UB2 to UB4
Communication cables
UB5 to UB7
Signal cables
remainder
NOTE
Electrical installation and service must be car-
ried out under the supervision of a qualified
electrician. Cut the current with the circuit
breaker before carrying out any servicing.
Electrical installation and wiring must be car-
ried out in accordance with the stipulations in
force.
NOTE
The live external control must be taken into
consideration when connecting.
NOTE
The heat pump must not be powered when
installing AMB 30.
NOTE
Refer to the outline diagram of your system
for positioning of the temperature sensor.
LEK
FA1
UB1
UB2-4
UB5-7
AA6-COM1
AA6-X8
AA6-F1
AA6-X6
AA6-X7
AA6-SF2
AA6-COM2
X1
AA6-X4
AA6-X3
AA6
AMB 30
Chapter 5 |
Electrical connections
20
5 Electrical connections
Summary of Contents for AMB 30
Page 1: ...Installer manual LEK AMB 30 Accessories F1345 IHB GB 1341 1 231417 ...
Page 2: ......
Page 47: ...Electrical circuit diagram 45 Chapter 12 Technical data AMB 30 ...
Page 48: ...AMB 30 Chapter 12 Technical data 46 ...
Page 49: ...47 Chapter 12 Technical data AMB 30 ...
Page 51: ......
Page 52: ...NIBE AB Sweden Hannabadsvägen 5 Box 14 SE 285 21 Markaryd info nibe se www nibe eu 231417 ...