www.nextups.eu
48
E
n
g
lish
3. Remove the UPS front cover
4. Disconnect the internal battery connectors
5. Replace the UPS front cover
6.3 Storing the UPS and Batteries
If you store the UPS for a long period, recharge the battery every 6
months by connecting the UPS to utility power. The batteries charge to
90% capacity in approximately 4 hours. However, it is recommended
that the batteries charge for 48 hours after long-term storage.
Check the battery recharge date on the shipping carton label. If the date
has passed and the batteries were never recharged, do not use the UPS.
Contact your service representative.
When to Replace Batteries
When the status summary screen displays the UPS fault icon with the
“Service Battery” alarm and the audible alarm sounds continuously, the
batteries may need replacement. Contact your service representative to
order new batteries.
6.4 Testing Batteries
For a battery test, please check:
The batteries must be fully charged.
The UPS must be in Normal mode with no active alarms.
The load must be higher than 10%.
To test batteries:
1 Connect the UPS to utility power for at least 48 hours to charge
the batteries.
2 Press the
button for one second to go to the main menu
selection and scroll down to the Control menu using the
button.
3 Press the
button to enter the Control menu.
4 Use the
button to scroll to the Battery Test option.
Summary of Contents for LOGIX II RT NETPACK 10000VA
Page 1: ...NEXT UPS Systems LOGIX II RT 6000 10000 NETPACK Installation and user manual English...
Page 4: ......
Page 31: ...www nextups eu 27 English Figure 4 5 a Parallel systerm wiring diagram of LOGIX II 6000 1000...
Page 32: ...www nextups eu 28 English Figure 4 5 b Parallel System Installation Diagram...
Page 43: ...www nextups eu 39 English...