www.nextups.eu
15
E
n
g
lish
5. Pull the battery tray out using the plastic tabs and then remove
the battery tray.
Figure 3-11: Removing the Battery Tray
6. Install the PDU’s ears to the UPS
Figure 3-12. Install the PDU’s ears to the UPS
7.
Select the proper holes in the rail for positioning the cabinet in
the desired location in the rack. Locate the rails at the bottom of
the 3U space allocated for the each UPS and
EXB
.
8.
Install the sliding rails in the rack, then install the UPS in the
sliding rail.