Installation instructions for the MANU automatic out of pool safety cover - 4/12
4
1. Pool preparation
1.1 Building
work
1.1.1 Concrete
belt
Fig. 1
Plan for a concrete belt using a 350 Kg cement per
m
3
concrete mix with a size of w 25 cm x h 40 cm
x len 100 cm using at least 0.10 m
3
to stabilise the
fi xture of the roller.
1.1.2 Overfl ow
Fig. 2
Plan to control the water level at 12 cm below the
edge using a ø 50 mm overfl ow which is independent
of the skimmers and an automatic fi ll.
1.1.3 Skimmer
When possible, plan to place the skimmers on
the pool widths and not on the lengths in order to
facilitate the movement of the cover.
1.2 Squaring
checks
Fig. 3
1.2.1 In order to correctly place your roller perpendicular
to the pool lengths: measure the diagonals.
1.2.2 Make a mark (1) on the pool lining at the level of the
edge opposite the cable exit.
1.2.3 Measure a precise length "A" of 1 m less than
the length of the pool and make a mark (2), at the
extremity of A on the pool liner.
1.2.4 On the opposite length make a mark (3) opposite
mark (1).
1.2.5 Carry over the "A" measurement from (3) in order to
place mark (4).
1.2.6 Measure the distance "B1" between (1) and (4).
1.2.7 Measure the distance "B2" between (2) and (3).
1.2.8 If B1 and B2 are equal continue with the next step,
otherwise correct the position of marks (3) and (4)
and start the operation again until B1 = B2.
Fig. 1
40cm
100cm
25cm
100 cm
25 cm
40 cm
Fig. 2
120mm
Ø50mm
120 mm
Ø 50 mm
Fig. 3
4
3
1
2
A
A
B1
B2
L
l
A
A
B2
B1
I