10
GAGE
EXH
OUT
Nut Plate
Valve
Mounting
Bracket
OUT
Leveling Valve
Nut &
Washer
Control Arm
Mounting Screws (2)
Washers (2)
10-32 Screws (2)
The valves should be attached to the isolators as shown in Figure 2.6 after
installing the table top.
A. Set the table height adjustment screw on each valve to the center of
its travel.
B. Attach the leveling valve to the isolators as shown in Figure 2.6.
Secure the valve to the bracket using the two mounting screws and
the nutplate. Position the valve at the bottom of the bracket slots
until after the table is installed and leveled.
C. Rotate the control arm on valves “A” in Figure 2.7 so that they point
towards the nearest corner of the table.
D. Rotate the control arm on valve “B” in the figure so that it points
toward the table’s center, midway between the isolators that it
controls.
Figure 2.6 — Leveling Valve Mounting
Summary of Contents for IPV
Page 2: ...ii...
Page 22: ...16 Figure 13 Double Bolt Tightening Sequence...
Page 32: ...INSTRUCTION MANUAL Vibration Control System...
Page 39: ...viii...
Page 63: ...24...
Page 64: ...25...