- 52 -
www.NewLeader.com
(800) 363-1771
312884-AA-C
NL345
Header
Initial Startup
WARNING
Stand clear of moving machinery�
NOTE: Do not load spreader with material�
1� Check entire unit to make sure all fasteners are in place and properly tightened per “Standard
Torques” section in this manual�
2� Make sure no other persons are in vicinity of spreader�
3� Make sure no loose parts are in unit or on conveyor or spinner�
4�
Check oil level in hydraulic reservoir; fill as necessary. Refer to “Lubricant & Hydraulic Oil
Specifications” section of this manual for proper oil. Completely open reservoir valves.
5� Start engine and turn on hydraulics� Allow hydraulics to circulate until oil is warm�
6� Run spinner at 300 RPM� Allow to run until spinner is operating smoothly and all air has been purged
from system�
7� Run conveyor at 20 RPM and spinner at 300 RPM� Run until conveyor is operating smoothly�
8� Run conveyor at 20 RPM and spinner at 700 RPM� Allow both conveyor and spinner to run until
operating smoothly�
9� Enable boundary left and right and verify that RPM adjust accordingly�
10� Run conveyor at 0RPM and spinner at 0RPM� Make sure both conveyor and spinner do not move�
11�
Verify spreader calibration as defined in the manual for the controller that is supplied with your
machine�
12� Complete spread pattern test per “Spread Pattern” section in this manual�
13� Shut system down�
WARNING
DO NOT check leaks with hands while system is operating as high pressure oil leaks can be
dangerous! If skin is pierced with hydraulic fluid at high pressure seek immediate medical
attention as fluid injected into the skin could cause gangrene if left untreated. Relieve
pressure before disconnecting hydraulic lines or working system� Make sure all hydraulic
fluid connections are tight and all hydraulic hoses and lines are in good condition before
applying pressure to the system� Wear protective gloves and safety glasses or goggles
when working with hydraulic systems�
WARNING
DO NOT check for leaks adjacent to moving parts while system is operating as there may
be danger of entanglement!
14� Check all connections in hydraulic system to make sure there are no leaks�
15�
Check hydraulic oil reservoir and refill to maintain level at mid-point of gauge.
Unit is now ready for field testing.
Summary of Contents for NL345/MULTAPPLIER
Page 6: ...Insert Current New Leader Warranty Warranty...
Page 26: ...26 www NewLeader com 800 363 1771 312884 AA C NL345 Informational Decals 1 1...
Page 86: ...86 www NewLeader com 800 363 1771 312884 AA C NL345 Header Hydraulic Schematic TR3000 Brakes...
Page 114: ...114 www NewLeader com 800 363 1771 312884 AA C NL345 Notes This Page Intentionally Left Blank...