9 - ACCESSORIES
9 - ACCESSORIES
###_10_###
Direct fit buckets
The data are referred for working operation with the dozer blade up and
400 kg
(
882 lb
) counterweight.
For cab configuration:
•
1.30 m
(
51.18 in
) arm, minimum lift value:
370 kg
(
815.71 lb
).
•
1.60 m
(
62.99 in
) arm, minimum lift value:
340 kg
(
749.57 lb
).
For canopy configuration:
•
1.30 m
(
51.18 in
) arm, minimum lift value:
350 kg
(
771.62 lb
).
•
1.60 m
(
62.99 in
) arm, minimum lift value:
320 kg
(
705.48 lb
).
Direct fit buckets application as function of the arm (for cab version)
General purpose buckets
Arm
Capacity
ISO 7451
(Heaped)
Width
Mass
1.30 m
(
51.18 in
)
1.60 m
(
62.99 in
)
0.060 m³
(
0.078 yd³
)
305 mm
(
12.01 in
)
73 kg
(
160.94 lb
)
●
●
0.090 m³
(
0.118 yd³
)
457 mm
(
17.99 in
)
93 kg
(
205.03 lb
)
●
●
0.120 m³
(
0.157 yd³
)
610 mm
(
24.02 in
)
112 kg
(
246.92 lb
)
●
●
0.188 m³
(
0.246 yd³
)
914 mm
(
35.98 in
)
150 kg
(
330.69 lb
)
♦ (**)
♦ (**)
Direct fit buckets application as function of the arm (for canopy version)
General purpose buckets
Arm
Capacity
ISO 7451
(Heaped)
Width
Mass
1.30 m
(
51.18 in
)
1.60 m
(
62.99 in
)
0.060 m³
(
0.078 yd³
)
305 mm
(
12.01 in
)
73 kg
(
160.94 lb
)
●
●
0.090 m³
(
0.118 yd³
)
457 mm
(
17.99 in
)
93 kg
(
205.03 lb
)
●
●
0.120 m³
(
0.157 yd³
)
610 mm
(
24.02 in
)
112 kg
(
246.92 lb
)
●
●
0.188 m³
(
0.246 yd³
)
914 mm
(
35.98 in
)
150 kg
(
330.69 lb
)
♦ (**)
Not applicable
● Density of material up to 1.6 t/m
3
▲ Density of material from 1.4 t/m
3
to 1.6 t/m
3
■ Density of material from 1.2 t/m
3
to 1.4 t/m
3
♦ Density of material under 1.2 t/m
3
(*) With this bucket, to improve digging performance and stability it is recommended to use additional counterweight.
(**) With this bucket, to improve digging performance and stability it is mandatory to use additional counterweight.
NOTICE:
make particular attention when swing the boom to the left-hand side: the attachment may collide with the
cab/canopy.
9-1
Summary of Contents for E37C
Page 70: ...3 CONTROLS AND INSTRUMENTS Footrest SMIL19MEX0775BA 17 3 12 ...
Page 146: ...5 TRANSPORT OPERATIONS 5 8 ...
Page 226: ...6 MAINTENANCE 6 80 ...
Page 230: ...7 TROUBLESHOOTING 7 4 ...
Page 238: ...8 SPECIFICATIONS 8 8 ...
Page 292: ...9 ACCESSORIES 9 54 ...