13
IV. Trial running
1.Trial running must after all the installation completed.
2.Please confirm the following matters before the trial operation, put “√”in the boxes after
confirmation
▲
Unit is installed correctly
▲
Power supply meets unit’s rated power source need
▲
Piping and wiring are correctly installed
▲
Unit air inlet/outlet well-ventilated
▲
Drain off water is done well
▲
Leakage protective device act effectively
▲
Pipe thermal insulation
▲
Grounding wire connected correctly
3.After check and ensure correct, then power on. If the control panel display nothing, that
should recheck and tight the line of control panel. The control panel should display time,
setting temperature and the current temperature.
4.Discharge the air out of the pipelines , and then press ON/OFF button, the unit work under
the setting temperature, unit’s trial running would check the following:
▲
First time to run the device, check the current normal or not;
▲
Operation panel’s function keys are normal or not;
▲
The indicator light is normal or not;
▲
The whole circulating hot water system whether has water leakage;
▲
The condensed water discharge is normal or not;
▲
System’s pressure is normal or not (according to the high water temperature or low
pressure);
▲
Whether there is abnormal sound and vibration when unit running;
▲
The wind, sound and condensed water from unit whether effect neighborhood;
▲
Whether there is leakage of refrigerant.
Notice:
There is a delay protection for unit’s reboot, e.g.: an immediate start or restart, the
unit have protection function required delay 3 minutes to restart to protect the
compressor.
Summary of Contents for BKDX30-95I/150/S
Page 1: ...1 ...
Page 21: ...21 7 Wiring diagram 1 BKDX50 200I 150 S D 2 BKDX50 200I 150 YI D ...
Page 22: ...22 3 BKDX30 95I 150 S D 4 BKDX30 95I 150 YI D ...
Page 28: ...28 ...