Technical Discussion
76
percentage of all measured hemoglobin, including measured dysfunctional
hemoglobins. To compare functional saturation measurements to those from an
instrument that measures fractional saturation, fractional measurements must be
converted as follows:
Measured versus Calculated Saturation
When saturation is calculated from a blood gas partial pressure of oxygen (PO
2
),
the calculated value may differ from the SpO
2
measurement of a pulse oximeter.
This usually occurs because the calculated saturation was not appropriately
corrected for the effects of variables that shift the relationship between PO
2
and
pH, temperature, the partial pressure of carbon dioxide (PCO
2
), 2,3
-
DPG, and
fetal hemoglobin. See Figure 25.
Figure 25: Oxyhemoglobin Dissociation Curve
SatSeconds
Alarm Management
The NPB-40 utilizes Nellcor
SatSeconds
alarm management technique.
SatSeconds
is a function of the software within the NPB-40. With the
SatSeconds
technique, upper and lower alarm limits are set in the same way as traditional
alarm management. The clinician also sets a
SatSeconds
limit that allows
monitoring of %SpO
2
below the selected lower alarm limit for a period of time
before an audible alarm sounds. Refer to the NPB-40 Operator's manual for
managing
SatSeconds
.
functional saturation =
fractional saturation
100 - (% carboxyhemoglobin + % methemoglobin )
x100
Summary of Contents for Oximax NPB-40
Page 1: ......
Page 5: ...Contents NPB 40 iii Power Supply 81 Power Supply Monitoring 81 Index 103...
Page 8: ...Tables vi This Page Intentionally Blank...
Page 18: ...Introduction 10 This Page Intentionally Blank...
Page 22: ...Routine Maintenance 14 This Page Intentionally Blank...
Page 40: ...Performance Verification 32 This Page Intentionally Blank...
Page 50: ...Troubleshooting 42 This Page Intentionally Blank...
Page 66: ...Spare Parts 58 This Page Intentionally Blank...
Page 70: ...Packing for Shipment 62 This Page Intentionally Blank...
Page 82: ...Specifications 74 This Page Intentionally Blank...
Page 90: ...Technical Discussion 82 This Page Intentionally Blank...
Page 92: ...Technical Discussion 84 This Page Intentionally Blank...
Page 94: ...Technical Discussion 86 This Page Intentionally Blank...
Page 96: ...Technical Discussion 88 This Page Intentionally Blank...
Page 98: ...Technical Discussion 90 This Page Intentionally Blank...
Page 100: ...Technical Discussion 92 This Page Intentionally Blank...
Page 102: ...Technical Discussion 94 This Page Intentionally Blank...
Page 104: ...Technical Discussion 96 This Page Intentionally Blank...
Page 106: ...Technical Discussion 98 This Page Intentionally Blank...
Page 108: ...Technical Discussion 100 This Page Intentionally Blank...
Page 110: ...Technical Discussion 102 This Page Intentionally Blank...
Page 113: ......