11.1. Connections of SKYRO 850
For cabling, follow the diagrams below.
3
1
2
3
F N
10
0-
23
0V
~
50
/6
0H
z
1 2
110/230V ~
- +
24
V
3
1
2
1
2
3
24V
11.2. Connections of SKYRO 850 Syncro³
Cable supplied together with the SYNCRO
3
actuator is 2,5 m long for 230V~ Syncro³ version
and 2 m long for 24V
Syncro³ version; it’s calculated in accordance with safety rules.
Electrical connection of the communication wires should be performed using a simple
appropriately sized bell clamp
(supplied with the appliance)
. Secure connections with good
electrical contact (copper to copper) are vital to avoid communication disturbs.
Maximum length of feeding cables can be 10 m.
For cabling, follow the diagrams below.
3
4
1
2
3
4
F N
10
0-
23
0V
~
50
/6
0H
z
1 2
110/230V ~
SYNCRO
- +
24
V
3
1
2
1
2
3
24V
SYNCRO
WARNING
:
after every limit switch or electronic protection device function the rack
will back track for around 1-2 mm in the opposite direction. This is quite normal, and
has been designed to release tension on mechanical parts and allow complete
weather proofing to enhance durability of mechanical parts.
12. PROGRAMMING THE ACTUATOR
Once all electrical connections are completed, before putting the actuator into operational
use, the procedure for acquiring the operating parameters must first be performed; this
operation is known as
R
ESET
.
The actuator has been individually tested in th
comes already programmed for the maximum opening stroke.
R
ESETTING
, or if the actuator loses its basic settings, the internal memory automatically
recognises and saves the install
between sash and frame.
The difference in height between the protruding part of the sash and the frame is known as
“overlay”
(See § 12.3)
and in the acquisition phase it allows the actuator to acquire the
closing stroke-end parameter.
or following a
R
ESET
operation, and it
On the left side of the gear reducer there is a screw cap that must be removed in order to
access the dip-switch. Beside it there is also an LED indicator used to define errors and the
identifiers of the various machines
Programming is quick and simple and can be done at an
With the dip-switch set to
implemented and the stroke is memorised
With the dip-switch set to
installation procedure and implements the operating parameters and stroke end
position.
IMPORTANT: If the K-
actuator, a new
R
ESET
Before starting the R
connection with the K-
12.1.
R
ESET
procedure
The procedure is valid for configuring a single actuator, a Syncro³ array or when a K
LOCK electromechanical lock is installed
IMPORTANT: The dip-switch
after each change it is necessary to wait a few seconds (~ 5 sec) before restoring the
power to the actuators in order for the change to become effective
Set the dip-switch to
OFF
. For configuration with multiple devices (or when a K
electric lock is installed) in which the
needs to be set for one actuator,
The actuator will start at once (or after about 8 seconds if there is an electro
perform a full closing manoeuvre (
manoeuvre of about 5 cm.
the movement of the rack
to complete the procedure.
When the operation is finished, each connected device gives a flashing orange signal to
indicate completion of the RESET procedure. Each device will give a different
flashes to indicate that the access code is received (actuator 1
flash → pause; actuator 2 → 2 flashes → pause → 2 flashes → pause, etc.)
16
PROGRAMMING THE ACTUATOR
Once all electrical connections are completed, before putting the actuator into operational
use, the procedure for acquiring the operating parameters must first be performed; this
The actuator has been individually tested in the factory, its operation is guaranteed and it
comes already programmed for the maximum opening stroke. During initial installation or
, or if the actuator loses its basic settings, the internal memory automatically
recognises and saves the installation and operating parameters, including the distance
The difference in height between the protruding part of the sash and the frame is known as
and in the acquisition phase it allows the actuator to acquire the
end parameter. This is seen the first time the device fully closes the window,
operation, and it is saved as an operating parameter
the gear reducer there is a screw cap that must be removed in order to
switch. Beside it there is also an LED indicator used to define errors and the
of the various machines.
Programming is quick and simple and can be done at any time.
switch set to
ON
, the actuator is operational, the parameters are
implemented and the stroke is memorised.
switch set to
OFF
(1), the actuator performs the
installation procedure and implements the operating parameters and stroke end
-Lock electro-mechanical lock is fitted, even to only one
procedure must be performed.
R
ESET
procedure, it is advisable to check the electrical
-LOCK.
The procedure is valid for configuring a single actuator, a Syncro³ array or when a K
LOCK electromechanical lock is installed.
switch settings should be changed to non
after each change it is necessary to wait a few seconds (~ 5 sec) before restoring the
power to the actuators in order for the change to become effective
. For configuration with multiple devices (or when a K
electric lock is installed) in which the
G
REEN
wires are connected, the dip
needs to be set for one actuator, the other devices will link to it automatically
once (or after about 8 seconds if there is an electro
perform a full closing manoeuvre (rack completely retracted) and then an opening
manoeuvre of about 5 cm. During this phase, ensure that there are no obstructions to
the movement of the rack and, when using Syncro actuators, wait for all the machines
.
When the operation is finished, each connected device gives a flashing orange signal to
indicate completion of the RESET procedure. Each device will give a different
flashes to indicate that the access code is received (actuator 1 → 1 flash → pause → 1
→ pause; actuator 2 → 2 flashes → pause → 2 flashes → pause, etc.)
Once all electrical connections are completed, before putting the actuator into operational
use, the procedure for acquiring the operating parameters must first be performed; this
e factory, its operation is guaranteed and it
During initial installation or
, or if the actuator loses its basic settings, the internal memory automatically
ation and operating parameters, including the distance
The difference in height between the protruding part of the sash and the frame is known as
and in the acquisition phase it allows the actuator to acquire the
This is seen the first time the device fully closes the window,
is saved as an operating parameter.
the gear reducer there is a screw cap that must be removed in order to
switch. Beside it there is also an LED indicator used to define errors and the
, the actuator is operational, the parameters are
(1), the actuator performs the
R
ESET
or initial
installation procedure and implements the operating parameters and stroke end
mechanical lock is fitted, even to only one
procedure, it is advisable to check the electrical
The procedure is valid for configuring a single actuator, a Syncro³ array or when a K-
settings should be changed to non-powered actuators;
after each change it is necessary to wait a few seconds (~ 5 sec) before restoring the
power to the actuators in order for the change to become effective.
. For configuration with multiple devices (or when a K-LOCK
wires are connected, the dip-switch only
the other devices will link to it automatically
once (or after about 8 seconds if there is an electro-lock) and
completely retracted) and then an opening
During this phase, ensure that there are no obstructions to
and, when using Syncro actuators, wait for all the machines
When the operation is finished, each connected device gives a flashing orange signal to
indicate completion of the RESET procedure. Each device will give a different number of
→ 1 flash → pause → 1
→ pause; actuator 2 → 2 flashes → pause → 2 flashes → pause, etc.).