The power supply to the devices can now be switched off.
The opening stroke
(outward
stroke)
or can be customised as required; this is decided at this stage
Command the actuator to
desired position (stroke customisation). The point at which the command is stopped will
be the outward stroke-end position.
as the
O
PENING
stroke end
the same point.
If the window does not open to the desired position, repeat the
If the K-LOCK electro-lock is present, refer to the respective user and installation
manual.
12.2. Closing stroke-end
There are two options for the opening stroke end
stroke
(factory default)
, which depends on the length of the rod, or
programming the desired stroke
The closing stroke end
(rack return travel)
stops due to the power absorption it encounters when the rack reaches complete closure
of the window, with the seals fully compressed, or when the power absorbed exceeds a
threshold set in the microprocessor
CAUTION:
After each closure or activation of the electronic protection, the rack
moves slightly in the opposite direction, to allow the right compression of the seals
and/or to relax the internal mechanical components of the actuato
After programming the stroke end positions, it is recommended to check the opening and
closing of the window a few times. In the case of error, the programming can be repeated
to achieve the desired stroke. If you need to perform the
instructions given above.
12.3. Overlap acquisition
The operation that must be carried out to acquire the overlap (after the
has already been executed) is described below:
- The steps for installing the actuator/s on the window and the electrical connections
have already been explained (see § 10 and
- Use the controls to open the window a few centimetres
- Use the controls to close the window up to the stroke end
- When the window is completely closed, if acquisition of the overlap is successful, the
actuator will display an orange flashing light for 3 seconds
IMPORTANT:
If, for any reason, the actuator fails to complete the closure of
the window correctly, stopping before finishing the stroke, the
overlap acquisition operation will have to be repeated in that order, until the
procedure is completed correctly
17
The power supply to the devices can now be switched off.
(outward rack movement)
may be left as set in the factory
or can be customised as required; this is decided at this stage
Command the actuator to
O
PEN
,
without interrupting the command
desired position (stroke customisation). The point at which the command is stopped will
end position.
This outward distance will be saved and used
stroke end
. With Syncro³ actuators, they will move in sync a
If the window does not open to the desired position, repeat the
R
lock is present, refer to the respective user and installation
end
There are two options for the opening stroke end
(outward rack travel)
, which depends on the length of the rod, or
programming the desired stroke
(see §12.1)
.
(rack return travel)
is automatic and not programmable. The actuator
stops due to the power absorption it encounters when the rack reaches complete closure
of the window, with the seals fully compressed, or when the power absorbed exceeds a
n the microprocessor.
After each closure or activation of the electronic protection, the rack
moves slightly in the opposite direction, to allow the right compression of the seals
and/or to relax the internal mechanical components of the actuato
After programming the stroke end positions, it is recommended to check the opening and
closing of the window a few times. In the case of error, the programming can be repeated
to achieve the desired stroke. If you need to perform the
R
ESET
Overlap acquisition
The operation that must be carried out to acquire the overlap (after the
has already been executed) is described below:
The steps for installing the actuator/s on the window and the electrical connections
have already been explained (see § 10 and 11).
Use the controls to open the window a few centimetres.
Use the controls to close the window up to the stroke end.
indow is completely closed, if acquisition of the overlap is successful, the
actuator will display an orange flashing light for 3 seconds.
If, for any reason, the actuator fails to complete the closure of
the window correctly, stopping before finishing the stroke, the
overlap acquisition operation will have to be repeated in that order, until the
procedure is completed correctly
may be left as set in the factory
(maximum
or can be customised as required; this is decided at this stage.
without interrupting the command
, up to the
desired position (stroke customisation). The point at which the command is stopped will
This outward distance will be saved and used
. With Syncro³ actuators, they will move in sync and stop at
R
ESET
procedure.
lock is present, refer to the respective user and installation
(outward rack travel)
of the actuator: full
, which depends on the length of the rod, or
R
ESETTING
and
is automatic and not programmable. The actuator
stops due to the power absorption it encounters when the rack reaches complete closure
of the window, with the seals fully compressed, or when the power absorbed exceeds a
After each closure or activation of the electronic protection, the rack
moves slightly in the opposite direction, to allow the right compression of the seals
and/or to relax the internal mechanical components of the actuator.
After programming the stroke end positions, it is recommended to check the opening and
closing of the window a few times. In the case of error, the programming can be repeated
ESET
procedure, see the
The operation that must be carried out to acquire the overlap (after the
RESET
procedure
The steps for installing the actuator/s on the window and the electrical connections
indow is completely closed, if acquisition of the overlap is successful, the
If, for any reason, the actuator fails to complete the closure of
the window correctly, stopping before finishing the stroke, the
RESET
and
overlap acquisition operation will have to be repeated in that order, until the
12.4. LED Light signals
If there are any problems during installation or operation of the machines, consult the
possible causes listed below:
The LED can be seen on the cap that conceals the dip
positioned to the left of the gear reducer, and has three
R
ED
, indicates an error or malfunction;
G
REEN
, operation is OK
O
RANGE
, wait: functions in progress
Number
of
Flashes
Type of Error
1
Current error:
The actuator has detected an
overcurrent in the motor.
2
Communication error:
Communication between the devices
is interrupted, or the devices being
used have undergone the
procedure separately
3
Electro-lock error
4
Discordant internal setting:
The internal setting of the actuators
is discordant.
5
RESET Procedure error:
The
R
ESET
procedure was not
completed successfully or was
interrupted.
6
Wiring error:
The power supply cables of the
devices configured in Syncro³ are
inverted.
7
Encoder error:
The internal encoder had a
counting error
8
Electric power supply error:
The power supply voltage is outside
the permitted range or is unstable.
9
Alignment error:
The rack position displacement of
the actuators connected in Syncro
is beyond the permitted maximum.
10
Memory error:
The internal memory write
process failed.
11
Connection error:
A RESET procedure is being
started with actuators different than
Syncro³
18
If there are any problems during installation or operation of the machines, consult the
The LED can be seen on the cap that conceals the dip-switch,
positioned to the left of the gear reducer, and has three colours:
indicates an error or malfunction;
operation is OK;
wait: functions in progress.
WITH RED LED
Type of Error
Possible Solution
The actuator has detected an
overcurrent in the motor.
Check that there are no obstacles preventing
the actuator from completing its stroke. Check
that the actuator is installed correctly.
Communication error:
Communication between the devices
is interrupted, or the devices being
used have undergone the
R
ESET
procedure separately
Check the condition of the connection cables,
and repeat the
R
ESET
procedure if necessary.
Check the electro-lock.
manual
Discordant internal setting:
The internal setting of the actuators
Repeat the
R
ESET
procedure
RESET Procedure error:
procedure was not
completed successfully or was
Repeat the
R
ESET
procedure
The power supply cables of the
devices configured in Syncro³ are
Check and correct the wiring.
The internal encoder had a
Repeat the
R
ESET
procedure
Electric power supply error:
The power supply voltage is outside
the permitted range or is unstable.
Check the electrical contacts at
actuator cable and ensure that the power
supply is correct.
The rack position displacement of
the actuators connected in Syncro
is beyond the permitted maximum.
Repeat the
R
ESET
procedure
memory write
Repeat the
R
ESET
procedure
A RESET procedure is being
started with actuators different than
Check the type of actuators chosen for the
system.
Repeat the
R
ESET
If there are any problems during installation or operation of the machines, consult the
Possible Solution
that there are no obstacles preventing
the actuator from completing its stroke. Check
that the actuator is installed correctly.
Check the condition of the connection cables,
procedure if necessary.
lock. See the relevant
procedure
procedure
Check and correct the wiring.
procedure
Check the electrical contacts at the ends of the
actuator cable and ensure that the power
procedure
procedure
Check the type of actuators chosen for the
ESET
procedure