![Necta Korinto UL 120V Installation, Use And Maintenance Manual Download Page 5](http://html1.mh-extra.com/html/necta/korinto-ul-120v/korinto-ul-120v_installation-use-and-maintenance-manual_3829003005.webp)
1
© by N&W GLOBAL VENDING SpA
07 06 275- 00
TABLE OF CONTENTS
INTRODUCTION
PAGE 2
IDENTIFICATION OF THE VENDING MACHINE
PAGE 2
IN CASE OF FAILURE
PAGE 2
TRANSPORT AND STORAGE
PAGE 2
POSITIONING THE VENDING MACHINE
PAGE 3
WARNING FOR INSTALLATION
PAGE 3
PRECAUTIONS IN USING THE MACHINE
PAGE 3
WARNING FOR SCRAPPING
PAGE 3
TECHNICAL SPECIFICATIONS
PAGE 3
POWER CONSUMPTION
PAGE 4
ACCESSORIES
PAGE 4
LOADING AND CLEANING
PAGE 5
POWER SUPPLY SWITCHES
PAGE 5
HYGIENE AND MAINTENANCE
PAGE 5
USING THE VENDING MACHINE
PAGE 5
CONTROLS AND INFORMATION
PAGE 6
LOADING PRODUCTS
PAGE 6
SERVICE FUNCTIONS
PAGE 6
CLEANING THE WASTE TRAYS
PAGE 7
DISASSEMBLING AND CLEANING THE MIXERS PAGE 7
SUSPENDING FROM USE
PAGE 8
CLEANING THE FRESH-BREW UNIT
PAGE 8
INSTALLATION
PAGE 11
POWER SUPPLY SWITCHES
PAGE 11
UNPACKING THE VENDING MACHINE
PAGE 11
CONNECTION TO THE WATER MAINS
PAGE 12
CONNECTING TO THE POWER SUPPLY
PAGE 12
INSTALLING THE PAYMENT SYSTEM
PAGE 13
WATER SOFTENER UNIT
PAGE 13
INSERTING THE LABELS
PAGE 13
INITIALISING
PAGE 14
FILLING THE WATER SYSTEM
PAGE 14
BREWER UNIT CYCLE
PAGE 15
CHECKING AND ADJUSTING
THE MACHINE SETTINGS
PAGE 15
PRE-SELECTIONS
PAGE 15
DECAF PRE-SELECTION
PAGE 15
LARGE PRE-SELECTION
PAGE 15
COFFEE STRENGTH PRE-SELECTION
PAGE 15
NOTES ON PROGRAMMING
PAGE 16
POWER ON
PAGE 16
OPERATING MODES
PAGE 16
NORMAL OPERATING MODE
PAGE 16
SURFING MODE
PAGE 17
FILLER MENU
PAGE 17
STATISTICS
PAGE 17
SELECTION PRICES
PAGE 18
CHANGE TUBES CONTROL
PAGE 18
DISPLAYING THE TEMPERATURE
PAGE 19
TEST DISPENSING
PAGE 19
GSM PRE-ALARMS
PAGE 19
EVADTS TRANSFER
PAGE 19
FILLER MENU MASKING
PAGE 19
TECHNICIAN MENU
PAGE 20
FAILURES
PAGE 20
PROGRAMMING PARAMETERS
PAGE 21
STATISTICS
PAGE 25
TEST
PAGE 25
MISCELLANEOUS
PAGE 26
UP-KEY SETUP CONTROL
PAGE 26
UP-KEY STATISTICS CONTROL
PAGE 26
MAINTENANCE
PAGE 27
INTRODUCTION
PAGE 27
SANITISING THE MIXERS AND
THE FOODSTUFF CIRCUITS
PAGE 27
MAINTENANCE OF THE BREWER UNIT
PAGE 28
MAINTENANCE OF THE BOILER
PAGE 28
PERIODICAL CLEANING
PAGE 29
PRINTED BOARD FUNCTIONS
AND INDICATOR LAMPS
PAGE 30
ACTUATION BOARD
PAGE 30
PUSH-BUTTON BOARD
PAGE 31
BOILER CONTROL BOARD
PAGE 31
SIGMA BREWER CONTROL BOARD
PAGE 32
PAYMENT SYSTEMS EXPANSION BOARD
PAGE 32
HYDRAULIC SYSTEM
PAGE 33
PROGRAMMING MENU SUMMARY
PAGE 34
WIRING DIAGRAM
PAGE 88
Summary of Contents for Korinto UL 120V
Page 2: ......
Page 4: ......
Page 13: ...9 by N W GLOBAL VENDING SpA 07 06 275 00 The disassembly sequence is indicated below Fig 12...
Page 95: ...by N W GLOBAL VENDING SpA NOTE...
Page 96: ...N W GLOBAL VENDING S P A Sx44201...
Page 97: ...Koro FB 120V UL...
Page 98: ...by N W GLOBAL VENDING SpA NOTE...
Page 100: ......