AD-25182501
CHAPTER 3
Page 30
Revision 1.0.1
NAP- 200-003
Sheet 12/29
Installation of Main Equipment
Figure 003-13 Modular Layout for 3 PIM Configuration
-
+
-
+
-
+
PS12260
-
+
SHELF 1
MIN. BACKUP,
26 A-H
SHELF 2
MED. BACKUP
(SHELF 1+2),
52 A-H
PWR SUPPLY
LTC0
LTC1
LTC2
MDF0(L)
MDF0(L)
MDF0(L)
Power Board
BATTM0
10 Pair
10 Pair
10 Pair
10 Pair
10 Pair
MDF0
or
TPF0
PIM1
LTC0
LTC1
LTC2
PWR SUPPLY
100
Pair
(L)
Notes: - MDF cable lengths are 1.5 metres
- PIM 2 - LTC 2 connect to (L) Krone (MDF 1)
- LTC 0-1 connect to (R) Krone (MDF 0).
- 240V connect to 4 way power board.
- BATTM0 can be supplied for external battery
backup either as MIN. or MED. backup
configuration.
- If BATTM0 is not required use dummy module.
- If a 78 A-H battery is required, add another \
BATTM plus dummy module.
10 Pair
10 Pair
10 Pair
10 Pair
10 Pair
100
Pair
(L)
MDFO(L)
MDF0(R)
MDFO(R)
+
-
240V AC
PIM0
10 Pair
10 Pair
10 Pair
10 Pair
10 Pair
MDF1
or
TPF1
PIM2
LTC0
LTC1
LTC2
PWR SUPPLY
100
Pair
(L)
MDF0(R)
MDF0(R)
MDF1(L)