AD-25182501
TABLE OF CONTENTS (CONTINUED)
Page
2.
PROCEDURE
........................................................................................................................................
14
NAP-200
-001 Unpacking ........................................................................................................................
16
1. Unpacking Procedure .....................................................................................................
16
-002 Marking and Drilling ........................................................................................................
17
1. Confirmation of the Equipment Layout .........................................................................
17
2. Marking and Drilling ........................................................................................................
17
2.1 Floor Standing Installation............................................................................................
17
2.2 Wall-Mounting ................................................................................................................
18
-003 Installation of Main Equipment ......................................................................................
19
1. Installation of Modules ..................................................................................................
19
1.1 Floor Standing Installation............................................................................................
19
1.2 Wall-Mounting Installation ............................................................................................
23
1.3 19-Inch Rack-Mounting Installation..............................................................................
28
2. Precautions ......................................................................................................................
28
-004 Installation of Peripheral Equipment .............................................................................
50
1. Installation of SN64 ATTCON .........................................................................................
50
2. Installation of SN611 ATTCON .......................................................................................
54
-005 Connection of Battery .....................................................................................................
59
1. Internal Battery Connection ...........................................................................................
59
2. External Battery Connection ..........................................................................................
62
-006 Cable Running to the MDF .............................................................................................
63
1. Cable Running to the MDF .............................................................................................
63
-007 Termination of Cables on the MDF ................................................................................
66
1. Cable Connection to the MDF ........................................................................................
66
2. MDF Cross Connections.................................................................................................
77
-008 Mounting of Circuit Cards .............................................................................................. 108
1. Mounting Procedure ....................................................................................................... 108
-009 System Initialization and System Data Entry................................................................ 110
1. System Initialization ........................................................................................................ 110
1.1 All Clear, Except LEN0000 CAT .................................................................................... 110
1.2 Resident System Program ............................................................................................ 110
2. System Data Entry........................................................................................................... 111
2.1 CAT.................................................................................................................................. 111
2.2 MAT ................................................................................................................................. 112
-010 Operation Test ................................................................................................................. 113
-011 Installation of Peripheral Equipment ............................................................................. 114
1. Installation of BATTM ..................................................................................................... 114
TABLE OF CONTENTS
Page ii
Revision 1.0.1