CHAPTER 6 HOW TO USE MINICUBE2 WITH 78K0R MICROCONTROLLER
User’s Manual U18371EJ1V0UM
145
6.2.4 System shutdown procedure
Terminate debugging and shutdown the system in the following order.
If the following order is not observed, the target system or MINICUBE2 may be damaged.
(1) Debugger termination
Terminate
the
debugger.
(2) Target system power shutdown
Shutdown the power supplied to the target system. This step is not necessary if the power select switch is
set to
″
3
″
or
″
5
″
.
(3) Unplugging the USB cable
Unplug the USB cable from MINICUBE2 or the host machine.
(4) Unplugging the target cable
Unplug the target cable from MINICUBE2 or the target system.