Configuring Your Server 4-19
Server
Option
Parameter
Description
Your Setting
Assert NMI on
SERR
Disabled
[Enabled]
Specify whether to support PCI
SERR or not.
FRB-2 Policy
Disable FRB2 Timer
[Disable BSP]
Do Not Disable BSP
Retry 3 Times
Specify whether the processor is
disabled or not when FRB level 2
error occurred in BSP.
Boot Monitoring
[Disabled]
5 Minutes
10 minutes
15 minutes
20 minutes
25 minutes
30 minutes
35 minutes
40 minutes
45 minutes
50 minutes
55 minutes
60 minutes
Specify whether to enable or disable
the boot monitoring function on
booting, or select the time limit for
timeout.
To use this function, install NEC
ESMPRO Agent. Set this item to
"Disabled" if the system is booted
from OS without installation of NEC
ESMPRO Agent.
Boot Monitoring
Policy
[Retry 3 Times]
Always Reset
Specify the processing at the
occurrence of timeout during boot
monitoring.
If [Retry 3 times] is selected, the
system is reset after the occurrence
of timeout and OS boot is retried up
to three times.
If [Always Reset] is selected, the
system is reset after the occurrence
of timeout and OS boot is retried
repeatedly.
Thermal Sensor
Disabled
[Enabled]
Specify whether to enable or disable
the thermal sensor monitoring
function. If a thermal error is
detected with this item being set to
"Enabled", the system stops at the
end of POST.
BMC IRQ
Disabled
[IRQ 11]
Specify whether to assign IRQ for
BMC.
Post Error Pause
Disabled
[Enabled]
Specify whether to stop the POST
once at the end of POST if an error
occurs during the POST.
AC-LINK
Stay Off
[Last State]
Power On
Specify the state of power when the
AC power to the server is turn off
once and then on.
Power ON Delay
Time
[20] - 255
Specify the power on delay time
within the range between 20 and
255 seconds. The time specified is
valid when "Power On" or "Last
State" is specified for AC LINK.
Summary of Contents for Express5800/110Ri-1
Page 16: ...x This page is intentionally left blank ...
Page 34: ...1 18 Notes on Using Your Server This page is intentionally left blank ...
Page 172: ...5 36 Installing the Operating System with Express Setup This page is intentionally left blank ...
Page 194: ...6 22 Installing and Using Utilities This page is intentionally left blank ...
Page 206: ...7 12 Maintenance This page is intentionally left blank ...
Page 284: ...9 36 Upgrading Your Server This page is intentionally left blank ...
Page 286: ...A 2 Specifications This page is intentionally left blank ...
Page 294: ...C 2 IRQ This page is intentionally left blank ...
Page 348: ...F 2 Using a Client Computer Which Has a CD Drive This page is intentionally left blank ...
Page 352: ...G 4 Product Configuration Record Table This page is intentionally left blank ...