![NEC Express 5800/140Rb-4 Service Manual Download Page 65](http://html.mh-extra.com/html/nec/express-5800-140rb-4/express-5800-140rb-4_service-manual_251155065.webp)
Table 6 lists the LED states and the drive status indicated by each state.
Table 6.
LED States for Hot-Swap SCSI Drive Status
LED State
Status
Solid green
The hard drive is present and powered on.
Flashing green
The hard drive is active.
Solid yellow
There is an asserted fault status on the hard drive.
Flashing yellow
A rebuild of the hard drive is in progress.
Off
The hard drive is not powered on.
Installing a Hot-Swap Drive in a Carrier
Before you can install a drive in the hot-swap drive bay, you must install the drive into a drive
carrier. To install a hot-swap drive in a carrier:
1. If the plastic air baffle is installed in the carrier, remove the four screws that attach the air baffle
to the carrier. Save the air baffle in case you later remove a drive.
A Air
Baffle C Carrier
B Screw
D Plastic
rail
Figure 26. Removing a Plastic Air Baffle from a Carrier
2. Remove the hard drive from its wrapper and place it on an antistatic surface.
3. Record the new drive model and serial number in your equipment log.
Installing and Removing Components
57
Summary of Contents for Express 5800/140Rb-4
Page 1: ...Express5800 140Rb 4 Service Guide Express 5800 140Rb 4 Service Guide Document PN 6883250000 ...
Page 2: ......
Page 4: ......
Page 10: ...Figure 2 EXPRESS5800 140Rb 4 Server Labels ...
Page 20: ......
Page 32: ......
Page 34: ......
Page 36: ......
Page 106: ......
Page 137: ......
Page 139: ...Equipment Log Continued Item Manufacturer Name and Model Number Serial Number Date Installed ...