2. Setting Up Your Projector
58
2.3.4
Connecting the AC Power Cable to the LPS
Entrust a specialist to carry out the AC power supply work from the power supply equipment of
the building to the place of projector installation.
This document describes the connection procedure for the lamp power supply (LPS) assuming
that the AC power supply construction has been completed.
Warning
Before connecting the AC power cable to the lamp power supply, check
that the supply of the AC power is shut off. If not, it may cause fire or
electric shock.
[1]
Remove the terminal cover
at the top of the AC power
supply connecting terminal
of the lamp power supply.
[2]
Insert live wires of the AC power cable into the connection
terminal and fix them with screws.
Insert the solderless terminal into the fixing hole of the connecting terminal and tighten the screw
with a Phillips-head type screwdriver.
When using NC-32PS02 and the neutral phase is wired from the power supply equipment, wrap
the cable end such as insulation tape, so that it does not contact the live section. It is not
necessary to connect the neutral phase, because this phase is not used in this machine.
NC-32PS01 NC-32PS02
Warning
Securely fix the AC power cable to the connecting terminals using
screws. After screw fixing, check that all power cables are securely fixed
with screws. If they are not securely fixed, it may cause death, serious
wound or other bodily injuries.