Projector AC Power Supply Installation Specifications
The NC3200S series or the NC3240S series requires an AC power supply for the projector main
unit and an AC power supply for the lamp power supply. This section describes the work for the
AC power supply for the projector main unit.
Warning
Make sure to observe the contents described in this section.
Entrust a specialist to carry out the power supply work from the power
supply equipment of the building to the place of projector installation.
Work on the power supply is the responsibility of the worker who
performed the work. NEC shall accept no responsibility for problems
arising as a result of this work.
Install the electric outlet nearby the projector main unit so that the power supply can be cut by
unplugging the AC power cord.
AC power supply equipment
Do not use any voltage other than those shown below for the AC power supply connected to the
projector head.
100 V AC to 240 V AC, single phase, power, 50/60 Hz
Breaker
Connect the AC power supply from the power supply equipment of the building to the projector
head via a breaker. The breaker capacity will be as follows depending on the power supply
voltage.
AC power supply voltage used
Breaker current capacity
100-240V 10
A
AC power supply cable
Breaker
AC power
supply cable
AC power supply
equipment
Electric outlet
Breaker