9-19
“Confidential, Do Not Duplicate without written authorization from NEC.”
ASSEMBLY DIAGRAM
BALLAST PS2
Diagram symbol
Circuit symbol
Part name
Part code
Q’ty
Remarks
SRW142
HHCS*8*20*3GF
24V00741
4
Torque check
SRW137
PL-CPIMS*4*16*3GF
24V00471
4
Torque check
1
Fix the BALLAST POWER SUPPLY with screws by entering it from the rear side of the
FLAME ASSY lower stage.
2
Attach IGNITER along the sides of POWER SUPPLY.
4
Remove TERMINAL BOARD COVER of POWER
SUPPLY BALLAST, attach CABLE(AC1) from
NOISE FILTERS.
Tightening torque :
50
±
5kgf•cm
5
Attach the removed TERMINAL COVER.
Tightening torque : 6
±
1kgf•cm
3
There is an accessory Bracket 4-6 mounted as described previously.
Connect this bracket to the terminal block of the ballast power supply
as illustrated at left.
* Fix the mounting metal fittings of the igniter and the terminal block
of the ballast power supply using accessory screws (M6).
Tightening torque: 55
±
5kgf•cm
SRW142 X2P
SRW142
SRW142
SRW137 X4P
CAUTION : For GND cabling, use a spiral wire of green/yellow.
SAFETY
CABLE attachment should be used specified torque.
Summary of Contents for DLP CINEMA NC1600C
Page 7: ...NC1600C User s Manual DLP Cinema Projector ...
Page 53: ...47 6 Appendix 6 5 Outline Drawing 700 503 360 990 Units mm ...
Page 63: ... NEC Display Solutions Ltd 2007 Ver 2 07 07 ...
Page 64: ...NC TP6402 NC TP6401 User s Manual Touch Panel Controller NEC Viewtechnology Ltd ...
Page 71: ...G 3 MEMO Important Information ...
Page 94: ... NEC Viewtechnology Ltd 2005 2006 Printed in Japan Ver 2 06 06 ...
Page 95: ...7N8P6692 Printed on recycled paper NC TP6402 NC TP6401 User s Manual ...
Page 382: ...01154041 NC1600C ...