34
7350-K978 R6L Upgrade, Narrow Size Core
Installing the I/O Box and Power Supply Bracket
To install the I/O Box and Power Supply Bracket (I/O Box-PSU Bracket) to the NCR
SelfServ Checkout Narrow Core unit, follow these steps:
1. Do the following:
•
Install the System Power Supply on the I/O Box – PSU bracket. For more
information, refer to
Installing the System Power Supply on Bracket
•
Install the I/O Box on the I/O Box – PSU bracket. For more information, refer to
Installing the I/O Box on Bracket
2. Slide the bracket assembly to the hooks on the core floor to lock the bracket in place
and secure the bracket to the core wall using two screws.
3. Do any of the following:
•
Install other R6 Lite components. For more information, refer to the
•
Route the cables. For more information, refer to
Note:
For more information about routing cables, refer to
SCO R6 Lite (Narrow
Core) Routing Instructions (497-0520486).