7350-K978 R6L Upgrade, Narrow Size Core
29
Routing NCR 7702 Terminal Display Cables
To route the Display cables in the NCR SelfServ Checkout unit, follow these steps:
1. Install the Terminal Display. For more information, refer to
2. Using cable ties, secure the cables on the Supervisor Switch bracket and then route
the cables down into the back of the unit through the hole in the base mount.
Note:
The Supervisor Button cable is also routed with the Display cables.
3. Do any of the following:
•
Install other R6 Lite Narrow Core components. For more information, refer to
•
Route and sort cables. For more information, refer to
Note:
For more information about routing cables, refer to
SCO R6 Lite (Narrow
Core) Routing Instructions (497-0520486).