Inspection
Items
Description
Interval
General
Check
1. Clean the insulated surface with a dry cloth to remove
dust and moisture.
2. Check the exterior for damage.
3. Check for loose bolts and nuts in the operating
mechanism and the external parts.
4. Check stop ring and stop retainer for damage.
5. Check the connection between terminals and conductors.
6. Check for any thermal over heating
18 to 36 months (*)
Operation
Test
1. Operate a few times manually and
electrically and check each part for proper function.
2. Check position indicator and counter for proper function.
18 to 36 months (*)
Insulation
Resistance
1. Measure insulation resistance phase to phase and
phase to ground
2. Check insulation resistance between control circuit and
ground. Measured value less than specified should be
investigated and corrected
Every 5 years or 2,000
operations. (*)
Which ever comes first
Withstand
Voltage Test
1. Test the breaker with power withstand voltage
as specified
Every 5 years or 2000
operations. (*)
Which ever comes first
Lubrication
1. Lubricate operating mechanism as specified.
2. Clean finger clusters with a dry cloth. Re-grease as
specified.
7 years or
2,000 operations. (*)
Which ever comes first
Vacuum
Interrupter
1. Check the contact erosion indicator. Replace as specified.
2. Voltage withstand as specified.
3. Micro ohm as specified.
4. Slow close test as specified.
5. Timing test as specified.
7 years or
2,000 operations. (*)
Which ever comes first
or after short circuit oper-
ations
Control
Components
1. Check all control components (including charging motor)
via electrical operation over specified ANSI ranges.
7 years or
2,000 operations. (*)
Which ever comes first
(*) If 3 operations of short circuit current occurs perform all above.
Use unscheduled outage opportunities to clean and inspect breakers and switchgear
THE LISTS AND INTERVAL OF PERIODICAL INSPECTION - TABLE 15