Inspection and Maintenance Schedule 103
Note
Do not insert analyser probe during this
period to avoid possible “flooding” of sensor.
Note
where no air inlet test point is provided then a flue integrity check
with the analyser is not possible. The installer should verify that
flue integrity has been visually checked in accordance with the
yellow “Prior to CO and combustion ratio check” box above before
proceeding to the “Check CO and combustion ratio at maximum
rate” stage below.
SET BOILER TO MAXIMUM RATE
In accordance with boiler instructions, set
boiler to operate at maximum rate (full load
combustion to stabilise.
CARRY OUT FLUE INTEGRITY CHECK USING ANALYSER
Insert analyser probe into air inlet test point and allow readings to
stabilise.
Start
To next
page
Summary of Contents for NCB300-28K
Page 3: ......
Page 4: ...Revisions 3 Version Description of changes Date 1 00 First issue September 7 2022 Revisions...
Page 106: ...Memo...
Page 107: ...Memo...
Page 108: ...Memo...