53
Test operation
Open the water supply valve to supplement water in the boiler.
- The water supply pressure shall be kept to less than the allowable working pressure,
specified on the name plate of the boiler.
- Upon completion of water supplement, the makeup water lamp on the controller goes
out.
Connect the boiler to the power supply.
Do not touch the power cord with wet hands.
Remove the remaining air from the fuel line.
You may not remove the air in case of using the multiple pipe system.
Push the power switch of the boiler controller to on.
Open the valve on the fuel line.
Set the room temperature controller S/W at the operation mode.
After ignition of the boiler, check the combustion mode and the heating
circulation mode.
Η
Set the temperature on the temperature controller of the boiler controller
Ą
Set the room temperature controller button (High speed, Temperature, Time) at ON
Ą
Operation of the burner fan
Ą
Operation of the ignition transformer
Ą
Open the electronic valve
Ą
Combustion
Ą
Flame detection
Ą
ON/OFF in accordance with the temperature setting (operation of the circulation pump)
Θ
Check if the boiler stops operation and the circulation pump is operating, by adjusting the
temperature controller of the boiler controller.
Press the “Hot water” button on the room temperature controller in order
to check if the circulation pump stops operation and hot water is supplied.
Press the “Outing” button on the room temperature controller to check if
the boiler stops operation.
Summary of Contents for LST-58K
Page 1: ...LST 58K...
Page 2: ......
Page 11: ...The structure and its description 11 Boiler LST 58K...
Page 28: ...Outside drawing on the boiler 29 LST 58K...
Page 42: ...43 Standard piping drawing Open expansion Combi boiler Closed expansion Combi boiler...
Page 51: ...55 Electric wiring diagram IU08 2 IU0 D 2 OFU05G IU08K DU06P...
Page 53: ...memo 57...
Page 54: ...58 memo...
Page 55: ......