SHEILD SPACER INSTALLATION
Step 1: Remove the left cover.
Using a Phillips head
screwdriver remove the
left cover.
Step 2: Adding spacer to standoff.
Push the right side cover
away from the frame, Add
part 002-6845 to the
standoff as shown in the
picture.
Add a drop of CA adhesive
to part 002-6845 before
attaching to the standoff.
Step 3: Reattach cover.
14
Summary of Contents for Be Strong Commercial Series U916
Page 1: ...Be Strong 003 3376 060309A Rework Manual Commercial Series Bike U916 ...
Page 25: ...Place mast in carton Remove seat from bike Get 000 4897 bag and place over seat assembly 25 ...
Page 31: ...Band box shut on both ends Place bands where the upright supports are in box 31 ...
Page 33: ...The Multi Build FISP Load screen should look something like this OR 33 ...