Chapter 2
Routine Maintenance Procedures
In this chapter:
2.1
Cleaning
2.2
Safety testing
2.3
Performance Verification
2.4
Adjusting light intensity
This chapter includes procedures for routine maintenance of the neoBLUE light, hereafter called the Unit
Under Test (UUT). These procedures must be performed after any of the following events and/or as
prescribed by the institution’s maintenance schedule:
•
Initial receipt of the UUT at the institution.
•
Foreign material or liquid has been deposited on the UUT.
•
UUT has been visually damaged or subjected to mechanical shock (e.g., being dropped).
•
UUT has been submitted for maintenance or scheduled performance verification.
neoBLUE
®
LED Phototherapy System Service Manual
13
PN 001320 Rev K
Summary of Contents for neoBLUE
Page 1: ...Service Manual...