15. DRYER START-UP PROCEDURE
Do not allow the dryer to flow air unless powered up, switched on and cycling.
Resulting effect could be cartridge contamination; requiring replacement cartridges.
• Connect to mains power.
• Connect all pipe work, ensure inlet & outlet valves closed.
• Ensure the inlet operating pressure parameters are between 4-16 barg.
• Ensure the inlet air temperature is between 1.5°C - 50°C (35°F - 122°F).
• Turn on electrical power to the dryer.
• Slowly open inlet valve.
• The dryer will display its status and commence normal operation.
• Inspect dryer for leaks.
• Slowly open outlet valves.
• Leave in safe working condition before handing to customer.