Pre-Energization Checks
4
6
PT Fuse Verification
Inside the center switching cabinet, four (4) fused PTs may be observed using the two
(2) external wire-glass windows.
Visually verify all four (4) PT fuses are intact. A fuse that is “indicating” (see example
image) is not longer intact and will require replacement prior to operation.