Design Considerations
21
Design Considerations
Failing to plan is planning to fail. Although the myPV ClearSky™ Interconnection is very
simple to design for and incorporate into your project design, there are aspects of the
equipment that should be considered in the initial design to avoid unnecessary costs
and difficulties during construction.
Installation Location
The myPV ClearSky’s low profile and compact design provides Developers and
Engineers and unprecedented level of flexibility regarding installation location. While
many Customers choose to incorporate the padmount gear into the equipment pad
closest to the point of interconnection, others choose to locate the myPV ClearSky at
the Point of Interconnection (POI).
If you have concerns about the location of the myPV ClearSky’s metering and the POI,
we recommend one of the following 2 approaches:
Summary of Contents for ClearSky
Page 1: ...myPV ClearSky User Manual 1 myPV ClearSky User Manual ...
Page 12: ...Resources 12 ...
Page 14: ...Resources 14 ...
Page 19: ...Resources 19 ...
Page 20: ...Resources 20 ...
Page 48: ...Pre Energization Checks 48 Control Panel Verification Locations ...
Page 55: ...Initial Energization 55 ...
Page 63: ...Operational Testing 63 The myPV ClearSky may be left in this condition indefinitely ...
Page 68: ...Spare Parts 68 ...
Page 69: ...Spare Parts 69 ...