Operational Testing
61
MODE.
Single Phase Test Operation:
1. Press and Hold the SPD-TEST button for approximately 5 seconds, until …
2. … the ENABLED Yellow indicator is illuminated
3. Firmly press the A-PHASE button to TRIP the MV VFI Breaker for phase A … the
breaker should TRIP / OPEN
4. The A-PHASE button’s TRIPPED Green indicator should now be illuminated
5. The CLOSE button’s BREAKER CLOSED Red indicator will remain illuminated so
long as any-one MV VFI Breaker is still in the CLOSED position
Numbered Illustration of Protective Relay Indicators
Additional notes on single-phase mode operation:
Summary of Contents for ClearSky
Page 1: ...myPV ClearSky User Manual 1 myPV ClearSky User Manual ...
Page 12: ...Resources 12 ...
Page 14: ...Resources 14 ...
Page 19: ...Resources 19 ...
Page 20: ...Resources 20 ...
Page 48: ...Pre Energization Checks 48 Control Panel Verification Locations ...
Page 55: ...Initial Energization 55 ...
Page 63: ...Operational Testing 63 The myPV ClearSky may be left in this condition indefinitely ...
Page 68: ...Spare Parts 68 ...
Page 69: ...Spare Parts 69 ...