Receiving
2
9
Whenever possible, your Solar-Ops Account Manager will share tracking information
and put the driver directly in contact with the receiving party for receiving coordination.
All equipment arrives palletized, and may be lifted using the pallet for initial unloading.
The equipment arrives with four (4) SS Strap Clamps… DO NOT DISCARD THE SS
STRAP CLAMPS.
The SS Strap Clamps are reused for permanent pad mounting.