Operational Testing
94
The RVC panel on the left shows the LED illumination status before the closing in
sequence. The ClearSky panel on the right displays the 751 Relay and 735 status.
Pre-Commercial Energization Check
Before Energization, the ClearSky Plus panel should be connected to the grid power
with Grid voltage connected, the rest of the systems are open waiting for the close
procedure. The LED indicator should reflect the connection with the red LED on the Grid
Voltage, on the RVC Panel.
Summary of Contents for ClearSky Plus
Page 21: ...Resources 21 ...
Page 22: ...Resources 22 ...
Page 28: ...Design Considerations 28 myPV ClearSky PLUS 25kV Termination Cabinet Door Swing ...
Page 38: ...Receiving 38 Equipment is Wrapped Palletized Typically Equipment Delivery ...
Page 45: ...Receiving 45 Top Fuse Mounting Hardware Three 3 MV Fuses Fully Assembled Installed ...
Page 52: ...Electrical Terminations 52 LV Termination Cabinet ...
Page 56: ...Network Integration 56 ...
Page 64: ...Pre Energization Checks 64 View of Center Switching Cabinet Through Wire Glass Window ...
Page 67: ...Pre Energization Checks 67 View of Three 3 PT Fuses Through Wire Glass Window ...
Page 93: ...Operational Testing 93 Numbered Illustration of Protective Relay Indicators ...
Page 102: ...Spare Parts 102 ...
Page 103: ...Spare Parts 103 ...