toggle switch)
When a single-phase is TRIPPED/ OPENED, the myPV ClearSky’s PT voltage
reference is still sensing grid voltage as the PT taps are located on the Utility side of
the MV Breakers
The process described above may be repeated for the remaining phases for full
IEEE testing compliance
At any time a single-phase is OPEN, rotating the Selector Mode Switch to
AUTOMATIC will enable protection logic and force a 3-phase TRIP condition
The SPD-TEST button will automatically reset to DISABLED after 50 minutes from
the time it is first enabled
A single-phase that is TRIPPED by pressing and of the A-PHASE, B-PHASE, or C-
PHASE buttons may be CLOSED by simply pressing the same button again (like a
Additional notes on single-phase mode operation:
Summary of Contents for ClearSky Plus
Page 21: ...Resources 21 ...
Page 22: ...Resources 22 ...
Page 28: ...Design Considerations 28 myPV ClearSky PLUS 25kV Termination Cabinet Door Swing ...
Page 38: ...Receiving 38 Equipment is Wrapped Palletized Typically Equipment Delivery ...
Page 45: ...Receiving 45 Top Fuse Mounting Hardware Three 3 MV Fuses Fully Assembled Installed ...
Page 52: ...Electrical Terminations 52 LV Termination Cabinet ...
Page 56: ...Network Integration 56 ...
Page 64: ...Pre Energization Checks 64 View of Center Switching Cabinet Through Wire Glass Window ...
Page 67: ...Pre Energization Checks 67 View of Three 3 PT Fuses Through Wire Glass Window ...
Page 93: ...Operational Testing 93 Numbered Illustration of Protective Relay Indicators ...
Page 102: ...Spare Parts 102 ...
Page 103: ...Spare Parts 103 ...