Network Integration
55
Communications conduits should be run in parallel to the low voltage (LV) cable
conduits, and located inside the LV Termination Cabinet.
A dedicated large-bore (1-1/2” Diameter) wire gland is located on the right side wall of
the LV Termination Cabinet, labeled “NETWORK” to allow media routing between
termination cabinet and the Control Cabinet. The gland is oversized to allow multiple
media runs and pre-terminated ends.
Communications media may be managed in parallel to the PT/CT wire runs, and it is
recommended to foam/duct seal the wire gland to prevent moisture entry into the
Controls cabinet.
Media Routing
Wire Gland Entry (Black Plastic) on Far Right Wall
Summary of Contents for ClearSky Plus
Page 21: ...Resources 21 ...
Page 22: ...Resources 22 ...
Page 28: ...Design Considerations 28 myPV ClearSky PLUS 25kV Termination Cabinet Door Swing ...
Page 38: ...Receiving 38 Equipment is Wrapped Palletized Typically Equipment Delivery ...
Page 45: ...Receiving 45 Top Fuse Mounting Hardware Three 3 MV Fuses Fully Assembled Installed ...
Page 52: ...Electrical Terminations 52 LV Termination Cabinet ...
Page 56: ...Network Integration 56 ...
Page 64: ...Pre Energization Checks 64 View of Center Switching Cabinet Through Wire Glass Window ...
Page 67: ...Pre Energization Checks 67 View of Three 3 PT Fuses Through Wire Glass Window ...
Page 93: ...Operational Testing 93 Numbered Illustration of Protective Relay Indicators ...
Page 102: ...Spare Parts 102 ...
Page 103: ...Spare Parts 103 ...