High Gap
This is a hysteresis of the High Limit Point and the High Hyst
Point.
Buck Transfer
Point Setting
With AVR Off these settings have no effect.
Buck High
Point
VAC voltage setting at which the UPS switches from On Line to
Buck mode operation ( step down voltage ).
Buck Low
Point
This is the VAC voltage level down to which the VAC input must
lower (after being above Buck High Point ) before qualifying for
On Line operation.
Boost
Transfer Point
Setting
With AVR Off these settings have no effect.
Boost High
Point
VAC voltage setting at which the MP2000E switches from On Line
to Boost mode operation ( step up voltage ).
Boost Low
Point
This is the VAC voltage level down to which the VAC input must
raise (after being below Boost Low Point ) before qualifying for
On Line operation.
Low Voltage
Transfer Point
Setting
This is the VAC input voltage level at which the MP2000E
switches from On Line to On Battery.
Low Limit
Point
VAC voltage setting at which the MP2000E switches from On Line
to On Battery.
Low Hyst
Point
Low Hysteresis Point
– This is the VAC voltage level up to which
the VAC input must rise (after being below Low Limit Point)
before qualifying for On Line operation.
Low Gap
This is a hysteresis of the Low Limit Point and the Low Hyst
Point.
AVR Feature
Setting
Turn On or Off boost and / or buck operation.
Figure 6-62: AVR Transfer Point Form Fields
Summary of Contents for MP Series
Page 3: ...III ...
Page 20: ...20 STEP 1 Connect CONTROL Wires ...
Page 22: ...22 Installation and Troubleshooting Guide Figure 9 ...
Page 30: ...30 MP2000E System Battery Backup System Section 2 Operator s Manual ...
Page 49: ...49 Figure 21 Note See Section 2 2 14 For details on Event Log View under Maintenance submenu ...
Page 51: ...51 2 2 8 Status Submenu CONT D ...
Page 70: ...70 2 3 3 Main Menu ...
Page 72: ...2 3 4 1 RS232 USB Menu Tree ...
Page 74: ...74 ...
Page 104: ...104 Figure 6 70 SMS for Event Log Screen ...
Page 126: ...126 ...
Page 148: ...148 ...