19
12. RISER RAIL FITTING INSTRUCTIONS
1.
Establish the height of the riser rail to
suit requirements, taking into account all
users.
2.
Remove caps and covers from
brackets.
3.
Mark the position of the lower bracket
then drill and plug the wall. If this is
a replacement installation locate the
bottom hole.
4.
Fit rail through lower bracket and clamp.
Place the remaining bracket on top of
the rail making sure the slot in the rail is
located in the notch.
a.
For a replacement riser fix the top
bracket using the existing hole.
b.
For a new installation ensure the hole
position is vertically aligned and mark
the wall. Unclamp the lower bracket and
remove the rail then drill and plug the
wall before fixing the top bracket into
position.
5.
Slide the height adjuster onto the
rail. Tighten to the rail by turning the
locking cap. Then fit the soap dish –
dampening the rail will make it easier
to slide on. Finally fit the hose retaining
ring onto the bottom of the rail below
the soap dish.
6.
Replace the rail assembly through
the lower bracket. Fit the rail into top
bracket ensuring the slot locates into
the notch. Tighten the lower bracket
then refit the bracket caps.
NOTE:
The adjustable height adjuster
grips the conical ends of the hose, not the
handle of the showerhead.
CAUTION
Check there are no hidden cables or pipes before drilling holes for wall plugs.
Exercise great care when using power tools near water.
The use of a residual current device (RCD) is recommended.
!
!
!
!
TIPS
A piece of insulating or masking
tape applied to the wall before
marking out the Fixing holes will
help stop the drill from wandering,
particularly on tiled surfaces. When
working near a basin or bath, insert
the plug in the waste fitting so that
small parts cannot be lost.
Take care not to drop accessories or
tools into basin or bath.
!
!