![MWP W4B-120C Installation And Operation Manual Download Page 7](http://html1.mh-extra.com/html/mwp/w4b-120c/w4b-120c_installation-and-operation-manual_1861119007.webp)
USER MANUAL
7
2- W4B-120C Installation
The installation instructions describe wind battery charging.
2 .1 General Information
The mounting location is important to the performance and operating life of the wind char-
ger. The environment must be dry and protected as noted below. The wind charger may
be installed in a ventilated enclosure with sealed batteries, but never in a sealed battery
enclosure or with vented batteries.
2 .2 Installation Overview
The installation is straightforward, but it is important that each step is done correctly and
safely. A mistake can lead to dangerous voltage and current levels. Be sure to carefully fo-
llow each instruction in Section 2.3 and observe all cautions and warnings.
The following diagrams provide an overview of the connections and the proper order:
Collector
(Wind generator
Output Frequency)
1 2
1 2 3
WIND INPUT
Battery
Po
Battery
Negative -
Diversion load
Po
Diversion load
Negative -
PE
DIP
Switches