
3.6.8 Replacing T Fence
102
3.6 Replacing Y Rail part
VJ628XE-M-00
7
Mountain fold (at 90 degrees) the new T fence
at 9mm from the tip and put it on a hook on the
R side.(Do not fold the opposite side.)
8
Attach T fence to pass along the center of CR
encoder.
A : CR Encoder
B : T Fence
9
To reassemble unit, reverse the removal
procedure.
9mm
90
q
A
B