background image

Messages

Yellow

Red

Solid On

Flashing

Flashing

Output is powered by grid in Line mode.

Output is powered by battery or PV in battery mode.

Battery is charging or discharging.

Fault occurs in the inverter.

Warning condition occurs in the inverter.

Solid On

Flashing

Function Keys

MENU

UP

DOWN

ENTER

Description.

Increase the setting data.

Decrease the setting data.

13

Enter setting mode and Confirm the selection in setting mode go to next selection or exit the 
reset mode.

Enter reset mode or setting mode go to previous selection.

OPERATION
Power ON/OFF

Once the unit has been properly installed and the batteries are connected well, simply press On/Off switch (located 
on the button of the case) to turn on the unit.

Operation and Display Panel

The operation and display panel, shown in below chart, is on the front panel of the inverter. It includes three indicators, 
four function keys and a LCD display, indicating the operating status and input/output power information.

LED Indicator

LED Indicator

AC/INV

Green

CHG

FAULT

Function Keys

LCD Setting

After pressing and holding "ENTER" button for 2 seconds, the unit will enter setting mode. Press "UP" or "DOWN" 
button to select setting programs. And then, press "ENTER" or "MENU" button to confirm the selection and exit.

Setting Programs:

Program

Description

Selectable option

00

Exit setting mode

Escape

(default)

Output source priority selection

01

16

Solar energy provides power to the 
loads as first priority, If solar energy is 
not sufficient to power all connected 
loads, Utility energy will supply power 
to the loads at the same time. The 
battery energy will supply power to the 
load only in the condition of the utility is 
unavailable. If the solar is unavailable, 
the utility will charge the battery until 
the battery voltage reaches the setting 
point in program 21.If the solar is 
available, but the voltage is lower than 
the setting point in program 20, the 
utility will charge the battery until the 
battery voltage reaches the setting 
point in program 20 to protect the 
battery from damage.

Solar energy provides power to the 
loads as first priority, If solar energy is 
not sufficient to power all connected 
loads, battery energy will supply power 
to the loads at the same time. Utility 
provides power to the loads only when 
battery voltage drops to either low-level 
warning voltage or the setting point in 
program 20 or solar and battery is not 
sufficient. The battery energy will supply 
power to the load in the condition of the 
utility is unavailable or the battery 
voltage is higher than the setting point 
in program 21(when BLU is selected) or 
program 20(when LBU is selected). If 
the solar is available, but the voltage is 
lower than the setting point in program 
20, the utility will charge the battery 
until the battery voltage reaches the 
setting point in program 20 to protect 
the battery from damage.

Summary of Contents for PV18 MPPT 3 KW

Page 1: ...420 00314 A1 3KW 5KW ...

Page 2: ...pecifications 24 Table 3 Charge Mode Specifications 26 Table 4 General Specifications 27 TROUBLE SHOOTING 28 Appendix Approximate Back up Time Table 29 29 Appendix Approximate Back up Time Table Model Load W Backup Time 48Vdc 100Ah min Backup Time 48Vdc 200Ah min 4KW 400 5KW 800 1200 1600 2000 2400 2800 3200 3600 4000 500 1000 1500 2000 2500 3000 3500 4000 4500 5000 766 335 198 139 112 95 81 62 55...

Page 3: ...r 12 NEVER cause AC output and DC input short circuited Do NOT connect to the mains when DC input short circuits 13 Warning Only qualified service persons are able to service this device If errors still persist after following troubleshooting table please send this inverter charger back to local dealer or service center for maintenance 1 28 TROUBLE SHOOTING Problem LCD LED Buzzer Explanation Possi...

Page 4: ... for optimized battery performance Cold start function Basic System Architecture The following illustration shows basic application for this inverter charger It also includes following devices to have a complete running system Generator or Utility PV modules option Consult with your system integrator for other possible system architectures depending on your requirements This inverter can power all...

Page 5: ... cations Utility Charging Mode Charging Current Nominal Input Voltage Absorption Voltage AGM Gel LEAD Battery Flooded battery AGM Gel LEAD Battery Flooded battery AGM Gel LEAD Battery Flooded battery Re oat Voltage Float Voltage Charging Algorithm 33 Step Flooded Battery AGM Gel LEAD Battery 4 Step LI Solar Charging Mode INVERTER MODEL Rated Power MPPT charger solar charging current Max PV Array O...

Page 6: ...on is to be adhered to the wall vertically Be sure to keep other objects and surfaces as shown in the diagram to guarantee sufficient heat dissipation and to have enough space for removing wires SUITABLE FOR MOUNTING ON CONCRETE OROTHER NON COMBUSTIBLE SURFACE ONLY 25 Output power derating When AC input voltage drops to 95V or 170V depending on models the output power will be derated Transfer Time...

Page 7: ...d cable and terminal size as below Recommended battery cable and terminal size 24 Display Setting The LCD display information will be switched in turns by pressing UP or DOWN key The selectable information is switched as below order battery voltage battery current inverter voltage inverter current grid voltage grid current load in Watt load in VA grid frequency inverter frequency PV voltage PV cha...

Page 8: ...Grid state The inverter will provide output power from battery and PV power Inverter power loads from PV energy Inverter power loads from battery and PV energy Inverter power loads from battery only Stop mode The inverter stop working if you turn off the inverter by the soft key or error has occurred in the condition of no arid Operating State Description Operating State Description LCD display Ma...

Page 9: ...nection 1 Before making AC input output connection be sure to open DC protector or disconnector first 2 Remove insulation sleeve 10mm for six conductors And shorten phase L and neutral conductor N 3mm 3 Insert AC input wires according to polarities indicated on terminal block and tighten the terminal screws Be sure to connect PE protective conductor first Ground yellow green L LINE brown or black ...

Page 10: ... inverters are worked in parallel operation CAUTION Appliances such as air conditioner are required at least 2 3 minutes to restart because it s required to have enough time to balance refrigerant gas inside of circuits If a power shortage occurs and recovers in a short time it will cause damage to your connected appliances To prevent this kind of damage please check manufacturer of air conditione...

Page 11: ...lect programs And then press ENTER button to exit Reset setting disable 23 Backlight control 24 Alarm control Alarm on default Backlight on Backlight off default Alarm off 25 Beeps while primary source is interrupted Alarm on Alarm off default 27 Record Fault code Record enable default Record disable Reset setting enable 20 Fault Reference Code Fault Code Fault Cause LCD Indication 01 02 03 04 Fan...

Page 12: ...c model Increment of each click is 0 1V Low DC cut off battery voltage setting 19 48V model default setting 40 8V If self defined is selected in program 14 this program can be set up Setting range is from 40 0V to 48 0V for 48Vdc model Increment of each click is 0 1V Low DC cut off voltage will be fixed to setting value no matter what percentage of load is connected 19 If selected the display scre...

Page 13: ...rce no matter utility is available or not If this inverter charger is working in Battery mode only solar energy can charge battery Solar energy will charge battery if it s available and sufficient 08 If this inverter charger is working in Line Standby or Fault mode charger source can be programmed as below 60A default Setting range is from 1 A to 120A Increment of each click is 1A 11 18 80A defaul...

Page 14: ...int in program 21 for 5 minutes and the solar energy has been available for 5 minutes too the inverter will turn to battery mode solar and battery will provide power to the loads at the same time When the battery voltage drops to the setting point in program 20 the inverter will turn to bypass mode utility provides power to the load only and the solar will charge the battery at the same time Utili...

Page 15: ...ng mode Escape default Output source priority selection 01 16 Solar energy provides power to the loads as first priority If solar energy is not sufficient to power all connected loads Utility energy will supply power to the loads at the same time The battery energy will supply power to the load only in the condition of the utility is unavailable If the solar is unavailable the utility will charge ...

Page 16: ...indicates the AC information Indicates the DC information Indicate input voltage input frequency PV voltage battery voltage and charger current Indicate output voltage output frequency load in VA load in Watt and discharging current Configuration Program and Fault Information Indicates the setting programs Iindicates the warning and fault codes Warning flashing with warning code Fault lighting wit...