19
© Munters Corporation, July 2021
QM1095r1
Operation
4.
INITIAL START-UP:
With electrical power off, verify that the fan propeller turns freely
and that all fasteners are secure. Turn on electrical power and confirm that the fan
operates smoothly.
ADJUSTMENTS:
Set the fan control to the temperature shown on your ventilations system
drawing, or to a value which will provide the desired environmental conditions.
Three Phase Fans:
1)
The use of a quality frequency drive and the installation of line reactors is
recommended to reduce voltage spikes and harmonic distortion.
2)
Minimum operating frequency of 30 Hz.
3)
Will require three pole contractors with overload protection (by others).
4.1 Operation
WARNING
!
Disconnect Power
Before Servicing
WARNING
!
Moving Parts, Disconnect
Power Before Servicing.
WARNING
!
Moving Parts: Disconnect
Power Before Servicing.
WARNING
!
Do Not Power Wash
Electrical Devices.