22
Assigning Outlet Actions
:
The Outlet Actions box may include tasks that the user has created that are to be performed when the Outlet is
energized. Each action may be selected by using the mouse to click on and highlight the action that is to occur. An ac-
tion may be deselected by holding the Ctrl key (Command key for Mac) and clicking on the highlighted action. Addi-
tional actions may be selected by holding the Ctrl key (Command key for Mac) and clicking additional actions.
Be sure to click the “Save” button to save the action(s) that each outlet will perform. Once saved, the selected ac-
tion(s) will appear in grey under each respective outlet.
Refer to the
Scheduling
section of this user manual for step-by-step instructions to create, edit, and remove actions.
Saving Outlets Changes
:
Click the “Save” button to save any changes. When the “Save” button is clicked, all text boxes will illuminate Green
to indicate the changes have been saved and a prompt at the top of the page will indicate the changes have been suc-
cessfully saved. Once saved, the new name for Outlet 1 will be displayed on the Outlets and Summary pages. Addi-
tionally, changes to any of the names will be reflected in the Event History page for clarity.