Running the Example HCF Test
Landmark™ Test System Operation
63
Use the following parameters:
l
Meter Type
— Running Max/Min
l
Channel
— Landmark 1 (or other depending on your configuration)
l
Signal
— Force
l
Engineering Units
— N
5. Set up a Timed Displacement Meter.
Use the following parameters:
l
Meter Type
— Timed
l
Channel
— Landkmark 1 (or other depending on your configuration)
l
Signal
— Displacement
l
Engineering Units
— mm
A timed meter provides the current reading of the sensor.
6. Set up a Timed Force Meter.
Use the following parameters:
l
Meter Type
— Timed
l
Channel
— Landmark 1 (or other depending on your configuration)
l
Signal
— Force
l
Engineering Units
— N
Summary of Contents for Landmark 370 Series
Page 39: ...System Introduction Landmark Test System Operation 39...
Page 40: ......
Page 114: ......
Page 122: ......
Page 123: ...Decommissioning Landmark Test System Operation 123 Decommissioning Decommission 124...
Page 132: ......
Page 133: ......