Installation
MTS Landmark™ Tabletop Load Units - Product Information
55
D. Mount the load unit on the workbench using the hardware included with the isolation
tie-down kit.
Item
Description
1
Jam Nut
2
Isolation Pad
3
Washer
4
Threaded Stud
5
Spring
6
Self Locking Nut
9. Contact MTS Systems Corporation to arrange for installation services.
In the U.S. and Canada, call the MTS Call Center at 1-800-328-2255. Elsewhere, contact
your local MTS office.