Maintenance
MTS Landmark™ Tabletop Load Units - Product Information
85
Routine Maintenance Overview Checklist
Calendar Time using 8 hour
Running Time Rate Per Day
Daily Weekly Biweekly
Annually
Running Time-Hours
8
40
80
500
1000 1,500 2,000
Ensure the actuator platen area is
clean.
X
1
Check all filter indicators.
X
Ensure all hose, cables, and
connectors are attached properly.
X
Ensure that the crosshead, lifts, and
supports are in working order.
X
Ensure that the actuator is dry.
X
Ensure that the hydraulic service
manifold is in working order.
X
Ensure that the lift seal connection is
dry.
X
Ensure that the lock seal condition is
dry.
X
Lubricate the axial/torsional spline.
(Bionix frame at 75-100 hrs)
X
Ensure that the actuator is in working
order.
X
Inspect all labels to ensure they are
attached and legible.
X
Crosshead/Load Frame
Ensure that the crosshead, lifts, and
supports are in working order.
MTS
2
MTS MTS MTS
MTS
Recommended service to be performed at each running time interval noted
1
Symbol denotes services performed by equipment operators. Most of these procedures involve visual
checks that should not interfere with test system operation. These checks are also completed by
trained field service engineers on each Routine Maintenance visit.
2
Symbol denotes service performed by trained field service engineers as part of an MTS Routine
Maintenance plan. Some of these procedures require special service tools and/or specific service
training to complete.